Crossrail Western Running Tunnels, Bond Street and Tottenham Court Road Station. London

Getec  as part of the JV KGI  are lead monitoring and instrumentation contractors on the £475m Tunnel project to BFK JV. Getec and ITM soil provides Management, Automatic Total Station , surveying , manual surveying Hydrostatic level cells,   Instrumentation as well as supplying the monitoring database and visualisation for the project. The C300/C410 contract has 1700 Hydrostatic Cells, 40 Robotic Total stations, 120 in ground instrumentation installations and over 40000 individual monitoring points.  Getec  has installed over 25 Shape Accel arrays to measure station box excavations, TBM movements and for Sewer deformation monitoring. Getec also provides the data in AGS4 format directly from the gtcVisual database to the clients own archival database.