Getec install a settlement plate monitoring system in Durban, South Africa

Getec designed , shipped and installed a settlement monitoring system for a large warehouse development in Clairwood , Durban as part of Keller company-  Franki's $40 Million foundation project. The system was installed under a tight deadline and typically had  measurement lengths of over 180m. The system was a Geosense range of settlement cells with a low frequency radio link from each reservoir box to a central gateway. The project will last for over 5 years and will send data at 1/2 hour intervals.

Data and load sequence during and after construction will be displayed on Getec Quickview software.

 

 

Sitemap
×